SSD feasibility check

Work through the checklist to see which pathway your answers suggest — Green Lane, VicSmart, or standard planning. Then submit the form if you want a written feasibility pass (about 48 hours).

Share

EmailLinkedInFacebookX

Share notes

A clean title, summary, and link for posting by hand to LinkedIn, RedNote, WeChat, and similar platforms.

See the full SSD overviewUnderstand Victoria rulesExplore likely costsVisit the estate

How to use this page

Answer the pathway questions, read what each outcome usually means, tick the self-check, then submit the form if you want a written feasibility pass (about 48 hours). Nothing here replaces council or legal advice.

VC253/VC282 Hard Constraints

Max GFA
60 sqm
Siting
Behind front wall
Utilities
All-electric
Title
No subdivision
Main POS
25 sqm min

Pathway questions

Your answers suggest Green Lane, VicSmart, or standard planning — then confirm on your title.

Path to Approval Engine

Input your site parameters. The engine determines your approval pathway.

Do I Need a Permit?

Understanding the difference between Planning Permit and Building Permit.

Planning Permit

Assesses land use, neighborhood impact, overlays. Required when you don't meet Deemed-to-Comply criteria.

SSD Advantage: If your SSD meets Clause 54.03 criteria (≤60sqm, behind front wall, no gas, 25sqm POS retained), planning permit is bypassed entirely. That is the value proposition.

VicSmart Alternative: If overlays are present but SSD otherwise compliant, VicSmart expedites approval to 10 business days with no neighbor notification.

Quick self-check

Tick what you already know. 0/8 selected.

Regulatory Compliance

Site Buildability

Feasibility Blockers

GFA requirement exceeds 60 sqm
Front-yard siting requirement
Access constraints with no workable solution
Critical easements in buildable zone
Steep slope requiring major excavation/retaining
Service upgrades exceeding budget tolerance
Heritage or flood overlays requiring extensive assessment

Cost Tiers (Indicative)

Tier 1

Compliant & Compact

Practical finishes. Minimal complexity. Budget-optimized.

Tier 2

Rental-Ready

Better fit-out, durability, thermal comfort.

Tier 3

Architectural

Higher spec. Complex siteworks. Custom detailing.

Process Timeline

1
Feasibility assessment (48 hours)
2
Path to Approval determination
3
Scope lock + cost estimate
4
Design documentation
5
Building permit (2-4 weeks)
6
Construction + handover

Submit for a written feasibility pass

About 48 hours. Includes a pathway read based on what you tell us — not a council approval.

Share

EmailLinkedInFacebookX

Share notes

A clean title, summary, and link for posting by hand to LinkedIn, RedNote, WeChat, and similar platforms.

See the full SSD overviewUnderstand Victoria rulesExplore likely costsVisit the estate

FAQ

Need context before you submit? Open the hub, the rules page, or indicative costs — then come back here.

Victorian SSD Regulatory Compliance Service

Registered VicSmart Pathway Provider · Clause 54.03 Specialist

DTP SSD Guidelines·VC253/VC282 Compliant·Victoria Planning Provisions

This tool provides regulatory guidance and does not constitute legal or planning advice. Engage qualified professionals for site-specific determinations.